At this project, it is decided that the upper and lower sides of the slopes to be installed horizontal drains. As per construction drawing, the horizontal drains are installed at 12m depth and 6m interval. The holes of 100mm diameter are done by using rotary drilling with air compressed method. Then the 80mm diameter of PVC pipes wrapped with geotextile are slotted into the holes.
PVC pipes wrapped with geotextile
setting up of drilling machine
operator ready to use controller to operate the drilling machine
ready to drill. seen here is the driller bit with standard extension rod of 1.5m length.
drilling process to make a 100mm diameter hole
upon completion of the hole, then the PVC pipes wrapped with geotextile slotted into the hole
final push and adjustment of the pvc pipes into the hole